• The main core advantage of this side tunnels is that it would require only one person to handle the FIBC with a forklift, in other words the side tunnel loops are designed to stay open ready for the forklift to engage, consequently trimming down the time and cost when filling and handling.
  • Skirt or Duffle top with Inlet Filling and Discharge Spout.
  • Available with Baffle inside the Tunnel lift FIBC.